Monthly Archives: September 2017

Final Construction 2017 Update and Welcome Back!

Welcome Back Toreros! The university had a lot of construction projects this summer, one of these was the Colachis Plaza which included restructuring the Copley Library front entrance with new steps and ramp, while the plaza got a beautiful new fountain and multiple seating areas.  The good news is that the library’s entrance was officially re-opened yesterday, Tuesday, September 05, 2017, after twelve weeks of construction! The library’s old stairs were replaced with an expanded entrance that opens up to the Colachis Plaza. Fortunately, everything was finished just in time for the beginning of the fall semester!

This slideshow requires JavaScript.

For a recap of the summer construction project that led to the new library stairs and ramp and a completed Colachis Plaza check out these summer blogs:

Update #1

Update #2

Update #3

Update #4

Update #5

Welcome back and be sure to come in to experience the new entrance steps or visit us online at http://www.sandiego.edu/library to check out all that the library has to offer and stay tuned for upcoming events such as the Alcala Bazaar on September 12th and Banned Books Week September 24th-30th.  To keep up-to-date with what is happening in Copley Library you can follow us on FacebookTwitter, and Instagram.

Advertisements

Leave a comment

Filed under Uncategorized